Part Number: 700MOBHSC60BRZ / Vendor ID #: 75
Pre-Bent S Curve MonoRail
$390.00
Availability
  • Manufacturer availability unknown. Contact us before placing an order
Dimensions
Height: 0.60"
Width: 0.30"
Finish: Antique Bronze
Item Color 1: Brown
Master Color: Brown
Product Overview
BROWN MO HORIZ. S-CURVE ANT.B
Standard Information
Category:
Track Ltg.
Subcategory:
Track Accessories
Finish:
Bronze
Style:
Contemporary
Option:
Title 20
Refinement Options
Category:
Monorail Hardware
Finish:
Antique Bronze
Style:
Contemporary | Modern
Option:
Dry Rated
Bulb Dimmable:
False
Introduction Date:
01/01/2005
Ship Carton Height:
6.00
Ship Weight:
3
Special Features:
From the brand formerly known as Tech Lighting
Vendor Ship Method:
UPS Fedex
Warranty:
1 Year
Weight:
1.10
24 Volt:
False
Adjustable Head:
False
Cable Field Cuttable:
True
Cannot Ship To California:
False
Cannot Ship To Canada:
False
Damp Rated:
False
Dark Sky:
False
Dry Rated:
False
FWC Compliant:
False
Integrated LED:
False
Item Color 1:
Brown
Master Color:
Brown
Motion Sensor Included:
False
Photocell Included:
False
Replaceable Lamp:
False
Reversible:
False
Safety Rating:
ETL
Shape:
Pre-bent S-curve
Sloped Ceiling Compatible:
False
Solar Powered:
False
SORAA:
False
Stocking Type:
Made to Order
System:
MonoRail
Title 20:
False
Title 24:
False
Transformer Required:
False
Warm Color Dimming:
FALSE
WET IP65:
False
Wet Rated:
False
To: From: Subject:
Similar Products View all
Matched by:

Elegance Lighting

At Elegance Lighting, you’ll find a complete line of indoor and outdoor lighting fixtures, plus more! We offer fixtures from all the top brands, and a full range of custom lighting options. From chandeliers to pendants, wall sconces to under cabinet lighting, flush mounts to recessed lighting, we have you covered.

Contact Us

2436 Middle Country Rd
Centerreach, NY 11720
Phone: (631) 509-0640
Fax: (631) 509-0644

Store Hours

Monday - 9:30am-6:00pm
Tuesday - 9:30am-6:00pm
Wednesday - 10:00am-5:00pm
Thursday - 9:30am-6:00pm
Friday - 9:30am-6:00pm
Saturday - 10:00am-5:00pm
Sunday - Closed

Follow Us

Copyright © 2017-2024 Elegance Lighting. All Rights Reserved.
IDS image Security and Cards